← Home ← Tree

Plant assets

Plant · updated 2026-08-07 · 134 assets

Scores 134

Tag Name Tier Consequence Status Probability Risk Scored
AC-2 AC-2 1 5 CONFIRMED — — 2026-10-24
AHU-1 AHU-1 1 5 CONFIRMED — — 2026-10-24
AHU-1-DRV Drive & belts 1 5 PROVISIONAL — — 2026-10-24
AHU-1-MTR Supply motor 1 5 PROVISIONAL — — 2026-10-24
AHU-1-OA OA damper 1 5 PROVISIONAL — — 2026-10-24
AHU-1-SF Supply fan (blower) 1 5 PROVISIONAL — — 2026-10-24
AHU-2 AHU-2 1 5 CONFIRMED — — 2026-10-24
AHU-2-DRV Drive & belts 1 5 PROVISIONAL — — 2026-10-24
AHU-2-MTR Supply motor 1 5 PROVISIONAL — — 2026-10-24
AHU-2-OA OA damper 1 5 PROVISIONAL — — 2026-10-24
AHU-2-SF Supply fan (blower) 1 5 PROVISIONAL — — 2026-10-24
AHU1-VFD Supply-fan VFD 1 5 PROVISIONAL — — 2026-10-24
AHU2-VFD Supply-fan VFD 1 5 PROVISIONAL — — 2026-10-24
BMS Building management (Honeywell EBI) 1 5 CONFIRMED — — 2026-10-24
CT Cooling tower 1 5 CONFIRMED — — 2026-10-24
DWB Domestic city water booster 1 5 CONFIRMED — — 2026-10-24
FW Feedwater tank (deaerator) 1 5 CONFIRMED — — 2026-10-24
RTU-1 RTU-1 (HVAC-1) 1 5 CONFIRMED — — 2026-10-24
AC-1 Air compressor 1 2 4 CONFIRMED — — 2026-10-24
AC-2-CA Air compressor 2 2 4 CONFIRMED — — 2026-10-24
B-1 Boiler #1 1 4 CONFIRMED — — 2026-10-24
B-2 Boiler #2 1 4 CONFIRMED — — 2026-10-24
CH-1 Chiller #1 1 4 CONFIRMED — — 2026-10-24
CH-2 Chiller #2 1 4 CONFIRMED — — 2026-10-24
E-25 E-25 1 4 CONFIRMED — — 2026-10-24
E-39 E-39 1 4 CONFIRMED — — 2026-10-24
E-44 E-44 1 4 CONFIRMED — — 2026-10-24
E-45 E-45 1 4 CONFIRMED — — 2026-10-24
E-5 E-5 1 4 CONFIRMED — — 2026-10-24
FWP-1 Feedwater pump 1 1 4 CONFIRMED — — 2026-10-24
FWP-2 Feedwater pump 2 1 4 CONFIRMED — — 2026-10-24
HV-4 HV-4 (H&V-4) 1 4 CONFIRMED — — 2026-10-24
ICE-1 Ice machine 3 4 CONFIRMED — — 2026-10-24
P-5 Condenser pump 5 2 4 CONFIRMED — — 2026-10-24
P-5A Condenser pump 5A 2 4 CONFIRMED — — 2026-10-24
P-6 CHW pump 6 2 4 CONFIRMED — — 2026-10-24
P-6A CHW pump 6A 2 4 CONFIRMED — — 2026-10-24
AC1-AHU1-VFD VFD enclosure AC (AC1) 2 3 PROVISIONAL — — 2026-10-24
AC2-AHU2-VFD VFD enclosure AC (AC2) 2 3 PROVISIONAL — — 2026-10-24
AHU-1-BMS Sensors & BMS points 2 3 PROVISIONAL — — 2026-10-24
AHU-1-CC-BANK Cooling coil bank (totals) 2 3 PROVISIONAL — — 2026-10-24
AHU-1-CC1 Cooling coil A (CC-1) 2 3 PROVISIONAL — — 2026-10-24
AHU-1-CC2 Cooling coil B (CC-2) 2 3 PROVISIONAL — — 2026-10-24
AHU-1-CC3 Cooling coil C (CC-3) 2 3 PROVISIONAL — — 2026-10-24
AHU-1-FLT Filters 2 3 PROVISIONAL — — 2026-10-24
AHU-1-HTG HHW heating coil 2 3 PROVISIONAL — — 2026-10-24
AHU-1-RA RA damper 2 3 PROVISIONAL — — 2026-10-24
AHU-2-BMS Sensors & BMS points 2 3 PROVISIONAL — — 2026-10-24
AHU-2-CC-BANK Cooling coil bank (totals) 2 3 PROVISIONAL — — 2026-10-24
AHU-2-CC1 Cooling coil A (CC-1) 2 3 PROVISIONAL — — 2026-10-24
AHU-2-CC2 Cooling coil B (CC-2) 2 3 PROVISIONAL — — 2026-10-24
AHU-2-CC3 Cooling coil C (CC-3) 2 3 PROVISIONAL — — 2026-10-24
AHU-2-FLT Filters 2 3 PROVISIONAL — — 2026-10-24
AHU-2-HTG HHW heating coil 2 3 PROVISIONAL — — 2026-10-24
AHU-2-RA RA damper 2 3 PROVISIONAL — — 2026-10-24
AR-1 Compressed air receiver 2 3 CONFIRMED — — 2026-10-24
DHW Domestic water heater 2 3 CONFIRMED — — 2026-10-24
DRY-E East air dryer station 3 3 CONFIRMED — — 2026-10-24
DRY-W West air dryer 3 3 CONFIRMED — — 2026-10-24
E-1 E-1 2 3 CONFIRMED — — 2026-10-24
E-11 E-11 2 3 CONFIRMED — — 2026-10-24
E-12 E-12 2 3 CONFIRMED — — 2026-10-24
E-13 E-13 2 3 CONFIRMED — — 2026-10-24
E-14 E-14 2 3 CONFIRMED — — 2026-10-24
E-15 E-15 2 3 CONFIRMED — — 2026-10-24
E-16 E-16 2 3 CONFIRMED — — 2026-10-24
E-17 E-17 2 3 CONFIRMED — — 2026-10-24
E-18 E-18 2 3 CONFIRMED — — 2026-10-24
E-19 E-19 2 3 CONFIRMED — — 2026-10-24
E-2 E-2 2 3 CONFIRMED — — 2026-10-24
E-20 E-20 2 3 CONFIRMED — — 2026-10-24
E-21 E-21 2 3 CONFIRMED — — 2026-10-24
E-22 E-22 2 3 CONFIRMED — — 2026-10-24
E-23 E-23 2 3 CONFIRMED — — 2026-10-24
E-24 E-24 2 3 CONFIRMED — — 2026-10-24
E-26 E-26 2 3 CONFIRMED — — 2026-10-24
E-27 E-27 2 3 CONFIRMED — — 2026-10-24
E-28 E-28 2 3 CONFIRMED — — 2026-10-24
E-29 E-29 2 3 CONFIRMED — — 2026-10-24
E-3 E-3 2 3 CONFIRMED — — 2026-10-24
E-30 E-30 2 3 CONFIRMED — — 2026-10-24
E-32 E-32 2 3 CONFIRMED — — 2026-10-24
E-33 E-33 2 3 CONFIRMED — — 2026-10-24
E-34 E-34 2 3 CONFIRMED — — 2026-10-24
E-36 E-36 2 3 CONFIRMED — — 2026-10-24
E-37 E-37 2 3 CONFIRMED — — 2026-10-24
E-38 E-38 2 3 CONFIRMED — — 2026-10-24
E-40 E-40 2 3 CONFIRMED — — 2026-10-24
E-41 E-41 2 3 CONFIRMED — — 2026-10-24
E-46 E-46 2 3 CONFIRMED — — 2026-10-24
E-47 E-47 2 3 CONFIRMED — — 2026-10-24
E-48 E-48 2 3 CONFIRMED — — 2026-10-24
E-50A E-50A 2 3 CONFIRMED — — 2026-10-24
E-50B E-50B 2 3 CONFIRMED — — 2026-10-24
E-6 E-6 2 3 CONFIRMED — — 2026-10-24
REF-1 REF-1 2 3 CONFIRMED — — 2026-10-24
REF-11 REF-11 2 3 CONFIRMED — — 2026-10-24
REF-14 REF-14 2 3 CONFIRMED — — 2026-10-24
REF-3 REF-3 2 3 CONFIRMED — — 2026-10-24
REF-5 REF-5 2 3 CONFIRMED — — 2026-10-24
REF-6 REF-6 2 3 CONFIRMED — — 2026-10-24
REF-7 REF-7 2 3 CONFIRMED — — 2026-10-24
REF-8 REF-8 2 3 CONFIRMED — — 2026-10-24
REF-9 REF-9 2 3 CONFIRMED — — 2026-10-24
USG Cemline unfired steam generator 3 3 CONFIRMED — — 2026-10-24
VP-1 Vacuum pump 1 2 3 CONFIRMED — — 2026-10-24
VP-2 Vacuum pump 2 2 3 CONFIRMED — — 2026-10-24
AHU-1-HUM Humidification 3 2 PROVISIONAL — — 2026-10-24
AHU-1-MA Mixed-air section 3 2 PROVISIONAL — — 2026-10-24
AHU-2-HUM Humidification 3 2 PROVISIONAL — — 2026-10-24
AHU-2-MA Mixed-air section 3 2 PROVISIONAL — — 2026-10-24
CP-1 Duplex condensate pump/motor #1 2 2 CONFIRMED — — 2026-10-24
CP-2 Duplex condensate pump/motor #2 2 2 CONFIRMED — — 2026-10-24
HX-1 HHW heat exchanger Hx1 2 2 CONFIRMED — — 2026-10-24
HX-2 HHW heat exchanger Hx2 2 2 CONFIRMED — — 2026-10-24
P-3 Reheat HX pump 3 2 2 CONFIRMED — — 2026-10-24
P-3A Reheat HX pump 3A 2 2 CONFIRMED — — 2026-10-24
QT-1 Boiler bottom-blow quench tank 2 2 CONFIRMED — — 2026-10-24
E-31 E-31 2 1 PROVISIONAL — — 2026-10-24
E-35 E-35 2 1 PROVISIONAL — — 2026-10-24
E-4 E-4 2 1 CONFIRMED — — 2026-10-25
E-49 E-49 2 1 CONFIRMED — — 2026-10-25
E-51 E-51 2 1 CONFIRMED — — 2026-10-25
E-9 E-9 2 1 CONFIRMED — — 2026-10-25
REF-12 REF-12 2 1 CONFIRMED — — 2026-10-25
REF-13 REF-13 2 1 PROVISIONAL — — 2026-10-24
REF-2 REF-2 2 1 CONFIRMED — — 2026-10-25
AIR Air side — — — — — —
BUILDING Building — — — — — —
CA Compressed air — — — — — —
CHW Chilled-water plant — — — — — —
EXH Exhaust & roof fans — — — — — —
H2O Water systems & meters — — — — — —
STM Steam & heating plant — — — — — —

B-1 · boiler

Boiler #1

Johnston packaged firetube Scotch Marine — H-3124 / NB 6456.

Tier
1
Consequence
4 CONFIRMED
Probability
—
Risk
—
Scored
2026-10-24
Consequence note
B-2. Seasonal backup: 2nd boiler normally needed only below 0 F outside, depending on indoor RH. Losing one still hits the indoor environment hard, so 4 (Tier 1 floor).

Identity

Manufacturer
Johnston Boiler Company, Ferrysburg, MI
Type
Firetube Scotch Marine, packaged
Unit tag
221-4C
S.O. / serial
7408 #1 / H-3124
National Board
6456
Built
1977, ASME IV (1974)
MAWP
15 psi steam / 30 psi water (15S/30W)

Pressure vessel

Shell
78" dia × 100.5" long, SA285C 3/8"
Heads / tubesheet
SA285C 9/16"
Furnace
28⅜" ID × 79½" Morrison, SA285C 5/16"
Tubes
258 × SA178, 2" OD, gage 13
Heating surface
1,000 ft² (≈200 BHP)
Hydro test
60 psi

Water content

Flooded (derived)
≈ 1,475 gal
Normal operating
≈ 1,200 gal

Burner / motors

Blower motor
Baldor 7.5 HP, 3450 rpm, 184T
Compressor motor
Baldor 1.5 HP, 1725 rpm, 145T
Blower
Johnston R1075-40
Compressor
Quincy BK45
Nozzle
Delavan 30615-28
Programmer
Fireye 26CF6 / scanner 48PT2

Safety / trim

Safety valve
Kunkle 930, 2", set 15#
Steam outlet
1×8" 150#
Feed
1½" + 4" return nipple

Children