← Home ← Tree

Plant assets

Plant · updated 2026-08-07 · 134 assets

Scores 134

Tag Name Tier Consequence Status Probability Risk Scored
AC-2 AC-2 1 5 CONFIRMED — — 2026-10-24
AHU-1 AHU-1 1 5 CONFIRMED — — 2026-10-24
AHU-1-DRV Drive & belts 1 5 PROVISIONAL — — 2026-10-24
AHU-1-MTR Supply motor 1 5 PROVISIONAL — — 2026-10-24
AHU-1-OA OA damper 1 5 PROVISIONAL — — 2026-10-24
AHU-1-SF Supply fan (blower) 1 5 PROVISIONAL — — 2026-10-24
AHU-2 AHU-2 1 5 CONFIRMED — — 2026-10-24
AHU-2-DRV Drive & belts 1 5 PROVISIONAL — — 2026-10-24
AHU-2-MTR Supply motor 1 5 PROVISIONAL — — 2026-10-24
AHU-2-OA OA damper 1 5 PROVISIONAL — — 2026-10-24
AHU-2-SF Supply fan (blower) 1 5 PROVISIONAL — — 2026-10-24
AHU1-VFD Supply-fan VFD 1 5 PROVISIONAL — — 2026-10-24
AHU2-VFD Supply-fan VFD 1 5 PROVISIONAL — — 2026-10-24
BMS Building management (Honeywell EBI) 1 5 CONFIRMED — — 2026-10-24
CT Cooling tower 1 5 CONFIRMED — — 2026-10-24
DWB Domestic city water booster 1 5 CONFIRMED — — 2026-10-24
FW Feedwater tank (deaerator) 1 5 CONFIRMED — — 2026-10-24
RTU-1 RTU-1 (HVAC-1) 1 5 CONFIRMED — — 2026-10-24
AC-1 Air compressor 1 2 4 CONFIRMED — — 2026-10-24
AC-2-CA Air compressor 2 2 4 CONFIRMED — — 2026-10-24
B-1 Boiler #1 1 4 CONFIRMED — — 2026-10-24
B-2 Boiler #2 1 4 CONFIRMED — — 2026-10-24
CH-1 Chiller #1 1 4 CONFIRMED — — 2026-10-24
CH-2 Chiller #2 1 4 CONFIRMED — — 2026-10-24
E-25 E-25 1 4 CONFIRMED — — 2026-10-24
E-39 E-39 1 4 CONFIRMED — — 2026-10-24
E-44 E-44 1 4 CONFIRMED — — 2026-10-24
E-45 E-45 1 4 CONFIRMED — — 2026-10-24
E-5 E-5 1 4 CONFIRMED — — 2026-10-24
FWP-1 Feedwater pump 1 1 4 CONFIRMED — — 2026-10-24
FWP-2 Feedwater pump 2 1 4 CONFIRMED — — 2026-10-24
HV-4 HV-4 (H&V-4) 1 4 CONFIRMED — — 2026-10-24
ICE-1 Ice machine 3 4 CONFIRMED — — 2026-10-24
P-5 Condenser pump 5 2 4 CONFIRMED — — 2026-10-24
P-5A Condenser pump 5A 2 4 CONFIRMED — — 2026-10-24
P-6 CHW pump 6 2 4 CONFIRMED — — 2026-10-24
P-6A CHW pump 6A 2 4 CONFIRMED — — 2026-10-24
AC1-AHU1-VFD VFD enclosure AC (AC1) 2 3 PROVISIONAL — — 2026-10-24
AC2-AHU2-VFD VFD enclosure AC (AC2) 2 3 PROVISIONAL — — 2026-10-24
AHU-1-BMS Sensors & BMS points 2 3 PROVISIONAL — — 2026-10-24
AHU-1-CC-BANK Cooling coil bank (totals) 2 3 PROVISIONAL — — 2026-10-24
AHU-1-CC1 Cooling coil A (CC-1) 2 3 PROVISIONAL — — 2026-10-24
AHU-1-CC2 Cooling coil B (CC-2) 2 3 PROVISIONAL — — 2026-10-24
AHU-1-CC3 Cooling coil C (CC-3) 2 3 PROVISIONAL — — 2026-10-24
AHU-1-FLT Filters 2 3 PROVISIONAL — — 2026-10-24
AHU-1-HTG HHW heating coil 2 3 PROVISIONAL — — 2026-10-24
AHU-1-RA RA damper 2 3 PROVISIONAL — — 2026-10-24
AHU-2-BMS Sensors & BMS points 2 3 PROVISIONAL — — 2026-10-24
AHU-2-CC-BANK Cooling coil bank (totals) 2 3 PROVISIONAL — — 2026-10-24
AHU-2-CC1 Cooling coil A (CC-1) 2 3 PROVISIONAL — — 2026-10-24
AHU-2-CC2 Cooling coil B (CC-2) 2 3 PROVISIONAL — — 2026-10-24
AHU-2-CC3 Cooling coil C (CC-3) 2 3 PROVISIONAL — — 2026-10-24
AHU-2-FLT Filters 2 3 PROVISIONAL — — 2026-10-24
AHU-2-HTG HHW heating coil 2 3 PROVISIONAL — — 2026-10-24
AHU-2-RA RA damper 2 3 PROVISIONAL — — 2026-10-24
AR-1 Compressed air receiver 2 3 CONFIRMED — — 2026-10-24
DHW Domestic water heater 2 3 CONFIRMED — — 2026-10-24
DRY-E East air dryer station 3 3 CONFIRMED — — 2026-10-24
DRY-W West air dryer 3 3 CONFIRMED — — 2026-10-24
E-1 E-1 2 3 CONFIRMED — — 2026-10-24
E-11 E-11 2 3 CONFIRMED — — 2026-10-24
E-12 E-12 2 3 CONFIRMED — — 2026-10-24
E-13 E-13 2 3 CONFIRMED — — 2026-10-24
E-14 E-14 2 3 CONFIRMED — — 2026-10-24
E-15 E-15 2 3 CONFIRMED — — 2026-10-24
E-16 E-16 2 3 CONFIRMED — — 2026-10-24
E-17 E-17 2 3 CONFIRMED — — 2026-10-24
E-18 E-18 2 3 CONFIRMED — — 2026-10-24
E-19 E-19 2 3 CONFIRMED — — 2026-10-24
E-2 E-2 2 3 CONFIRMED — — 2026-10-24
E-20 E-20 2 3 CONFIRMED — — 2026-10-24
E-21 E-21 2 3 CONFIRMED — — 2026-10-24
E-22 E-22 2 3 CONFIRMED — — 2026-10-24
E-23 E-23 2 3 CONFIRMED — — 2026-10-24
E-24 E-24 2 3 CONFIRMED — — 2026-10-24
E-26 E-26 2 3 CONFIRMED — — 2026-10-24
E-27 E-27 2 3 CONFIRMED — — 2026-10-24
E-28 E-28 2 3 CONFIRMED — — 2026-10-24
E-29 E-29 2 3 CONFIRMED — — 2026-10-24
E-3 E-3 2 3 CONFIRMED — — 2026-10-24
E-30 E-30 2 3 CONFIRMED — — 2026-10-24
E-32 E-32 2 3 CONFIRMED — — 2026-10-24
E-33 E-33 2 3 CONFIRMED — — 2026-10-24
E-34 E-34 2 3 CONFIRMED — — 2026-10-24
E-36 E-36 2 3 CONFIRMED — — 2026-10-24
E-37 E-37 2 3 CONFIRMED — — 2026-10-24
E-38 E-38 2 3 CONFIRMED — — 2026-10-24
E-40 E-40 2 3 CONFIRMED — — 2026-10-24
E-41 E-41 2 3 CONFIRMED — — 2026-10-24
E-46 E-46 2 3 CONFIRMED — — 2026-10-24
E-47 E-47 2 3 CONFIRMED — — 2026-10-24
E-48 E-48 2 3 CONFIRMED — — 2026-10-24
E-50A E-50A 2 3 CONFIRMED — — 2026-10-24
E-50B E-50B 2 3 CONFIRMED — — 2026-10-24
E-6 E-6 2 3 CONFIRMED — — 2026-10-24
REF-1 REF-1 2 3 CONFIRMED — — 2026-10-24
REF-11 REF-11 2 3 CONFIRMED — — 2026-10-24
REF-14 REF-14 2 3 CONFIRMED — — 2026-10-24
REF-3 REF-3 2 3 CONFIRMED — — 2026-10-24
REF-5 REF-5 2 3 CONFIRMED — — 2026-10-24
REF-6 REF-6 2 3 CONFIRMED — — 2026-10-24
REF-7 REF-7 2 3 CONFIRMED — — 2026-10-24
REF-8 REF-8 2 3 CONFIRMED — — 2026-10-24
REF-9 REF-9 2 3 CONFIRMED — — 2026-10-24
USG Cemline unfired steam generator 3 3 CONFIRMED — — 2026-10-24
VP-1 Vacuum pump 1 2 3 CONFIRMED — — 2026-10-24
VP-2 Vacuum pump 2 2 3 CONFIRMED — — 2026-10-24
AHU-1-HUM Humidification 3 2 PROVISIONAL — — 2026-10-24
AHU-1-MA Mixed-air section 3 2 PROVISIONAL — — 2026-10-24
AHU-2-HUM Humidification 3 2 PROVISIONAL — — 2026-10-24
AHU-2-MA Mixed-air section 3 2 PROVISIONAL — — 2026-10-24
CP-1 Duplex condensate pump/motor #1 2 2 CONFIRMED — — 2026-10-24
CP-2 Duplex condensate pump/motor #2 2 2 CONFIRMED — — 2026-10-24
HX-1 HHW heat exchanger Hx1 2 2 CONFIRMED — — 2026-10-24
HX-2 HHW heat exchanger Hx2 2 2 CONFIRMED — — 2026-10-24
P-3 Reheat HX pump 3 2 2 CONFIRMED — — 2026-10-24
P-3A Reheat HX pump 3A 2 2 CONFIRMED — — 2026-10-24
QT-1 Boiler bottom-blow quench tank 2 2 CONFIRMED — — 2026-10-24
E-31 E-31 2 1 PROVISIONAL — — 2026-10-24
E-35 E-35 2 1 PROVISIONAL — — 2026-10-24
E-4 E-4 2 1 CONFIRMED — — 2026-10-25
E-49 E-49 2 1 CONFIRMED — — 2026-10-25
E-51 E-51 2 1 CONFIRMED — — 2026-10-25
E-9 E-9 2 1 CONFIRMED — — 2026-10-25
REF-12 REF-12 2 1 CONFIRMED — — 2026-10-25
REF-13 REF-13 2 1 PROVISIONAL — — 2026-10-24
REF-2 REF-2 2 1 CONFIRMED — — 2026-10-25
AIR Air side — — — — — —
BUILDING Building — — — — — —
CA Compressed air — — — — — —
CHW Chilled-water plant — — — — — —
EXH Exhaust & roof fans — — — — — —
H2O Water systems & meters — — — — — —
STM Steam & heating plant — — — — — —

USG · steam_generator

Cemline unfired steam generator

Cemline H860USG20120 unfired steam generator — humidification; make-up on meter m5.

Tier
3
Consequence
3 CONFIRMED
Probability
—
Risk
—
Scored
2026-10-24
Consequence note
Tier 3 running/local base 2.

Identity

Model
H860USG20120
Type
Unfired (no burner), horizontal
Bundle
20 in dia × 120 in length
Tubes
1/2 in 20-ga copper, triangular pitch
Surface
823.0 ft² installed (759.4 required)
Serial No.
79433
Size
48 × 120 in
Gallon capacity
860 gal
Coil model
20120AA
Manufacturer
Cemline Corporation, Cheswick PA 15024

Design duty

Output steam
4,000 lb/hr @ 3 psig
Motive steam
10 psig plant steam, 5,841.9 lb/hr
Make-up water
40°F
Heat transfer
5.65 MMBTU/hr
U
460.3 BTU/hr·ft²·°F
Min steam valve Cv
285.8

Metering

Water meter
m5 Steam Generator Make-Up (×100)
Season
Reads 0 all summer — expected

Nameplate (unit)

Vessel max W.P.
125 psi
Water design pressure
50 psi
Steam design pressure
(relief 15 psi)
Relief valve set
15 psi

Stage 1 actuator

Mfr
PS Automation (Germany)
Type
PSF402.2-SE
Serial No.
413646
Datecode
C25
Supply
24 VAC/DC, 50/60 Hz, 25 W
Speed / thrust
2.00 mm/s · 2.00 kN
Enclosure
IP67
Order code
PUR1369

High stage actuator

Mfr
PS Automation (Germany)
Type
PSF402.2-SE
Serial No.
413644
Datecode
C25
Supply
24 VAC/DC, 50/60 Hz, 25 W
Speed / thrust
2.00 mm/s · 2.00 kN
Enclosure
IP67
Order code
PUR1369

Children